The brief
- UK Building Compliance carried out SAP Calculations at a set of properties in Glasgow, Scotland in order to satisfy Section 6 of the Building Regulations
The process
-
Compliance was achieved via:
-
6.75kWp Solar PV system
-
Very Low U-Values
-
Low Air Permeability
-
A low Thermal Mass (thanks to a timber frame construction)
The results
- SITE WIDE SAP RESULTS
Average Target Emission Rate (TER)
Average Dwelling Emission Rate (DER)
-
Compliant
-
The DER achieved well below the requirement in order to meet the TER