The brief
-
UK Building Compliance completed a combined package for this client
-
Ventilation Testing, two Air Pressure Tests & SAP Reports were completed
-
SAPs and Air Pressure Tests were conducted for the house and an annex
The process
- After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedures, all calibrated equipment was setup to ensure the most accurate result possible
- Ventilation Testing was conducted following Part F of the Building Regulations
- Our consultants assisted the client during this project providing help and recommendations to pass their SAP Report
The results
- SAP CALCULATION RESULTS
Target Emission Rate (TER)
Target Fabric Energy Efficiency (TFEE)
Target Emission Rate (TER)
Target Fabric Energy Efficiency (TFEE)
Dwelling Emission Rate (DER)
Dwelling Fabric Energy Efficiency (DFEE)
Dwelling Emission Rate (DER)
Dwelling Fabric Energy Efficiency (DFEE)
-
Compliant
-
The DER/DFEE achieved well below the requirement in order to meet the TER/TFEE
-
All the Ventilation Tests were performed with all Ventilation passing
-
Furthermore, our Combined Certification & Testing package offers excellent value