The brief
-
A combined package was completed by UK Building Compliance for our client
-
Ventilation Testing, Air Tightness Testing, Sound Insulation Testing & SAP Reports were completed
The process
- Further to reviewing drawings, on site testing was ready to be completed. our strict Air Tightness Testing procedures were adhered to, all calibrated equipment was setup to ensure the most accurate result possible was achieved
- Sound Insulation Testing was carried out following Part E of the Building Regulations
- Ventilation Testing was conducted following Part F of the Building Regulations
- We offered assistance to the client during this project providing help and recommendations to pass their SAP Report
The results
Airborne Wall Target
≥ 45
Airborne Wall Target
≥ 45
- SAP CALCULATION RESULTS
Target Emission Rate (TER)
Target Fabric Energy Efficiency (TFEE)
Dwelling Emission Rate (DER)
Dwelling Fabric Energy Efficiency (DFEE)
-
Compliant
-
The DER/DFEE achieved well below the requirement in order to meet the TER/TFEE
-
All the Ventilation Tests were performed with all Ventilation passing
-
Furthermore, our Combined Certification & Testing package offers excellent value