Back to Recent Projects
Project · 2025 High Wycombe

Full Design Stage Package near High Wycombe

Full design-stage compliance package on a new build dwelling — SAP calculations, water efficiency, background ventilation and TM59 overheating assessment. All four assessments compliant.

SAP CalculationsWater Efficiency CalculationsBackground Ventilation CalculationsTM59 Overheating Assessment
Full Design Stage Package near High Wycombe

The brief

UK Building Compliance was instructed to undertake SAP Calculations, Water Efficiency Calculations, Background Ventilation Calculations and a TM59 Assessment on a new build dwelling near High Wycombe.

The process

  • Once the drawings had been reviewed, we proceeded with the on-site testing.
  • In accordance with our rigorous air tightness and sound testing protocols, all calibrated equipment was carefully set up to deliver the most accurate results possible.
  • Our consultants guided the client to ensure compliance was met.

The results

  • Compliant on all four assessments.
  • Part O compliant with TM59 mitigations recommended.
  • Trickle vents provide Part F adequate flow rates.
  • Part G compliant — water efficiency of 109.65 L per person per day achieved (target ≤ 125 L).

Got a similar project? Let's talk.

15+ years of building compliance across every UK postcode. Fixed-price quotes, same-week turnaround on most projects.

UKBC Assistant

Online now · replies instantly