Back to Recent Projects
Project · 2021 London

Building Testing & Certification in London

Plot 1a Living Room/Kitchen - Plot 1 Living

Building Testing & Certification in London

The brief

The process

  • After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing, sound insulation testing and ventilation testing procedures, all calibrated equipment was setup to ensure the most accurate result possible
  • Our client consulted with us for all the elements in his project so with our guidance, we helped him build good construction specifications and provided consultation on an efficient boiler within his price range

The results

Airborne Wall Target

≥ 45

Plot 1a Living Room/Kitchen - Plot 1 Living Room/Kitchen

≥ 45

Plot 1a Bedroom - Plot 1 Bedroom

  • SAP RESULTS

Target Emission Rate (TER)

Target Fabric Energy Efficiency (TFEE)

Airborne Wall Result

Plot 1a Living Room/Kitchen - Plot 1 Living Room/Kitchen

Plot 1a Bedroom - Plot 1 Bedroom

Dwelling Emission Rate (DER)

Dwelling Fabric Energy Efficiency (DFEE)

  • Compliant

  • The building demonstrated high energy efficiency, scoring an Energy Rating of B

  • We achieved a Water Efficiency Rate of 122.67 Litres per person per day, the Target being ≤ 125L

  • All of the Ventilation Tests passed with no problems

  • With our Comprehensive Building Testing and Certification package, discounts are applied and furthermore all consultation on your project from start to finish is included in our fee

Got a similar project? Let's talk.

15+ years of building compliance across every UK postcode. Fixed-price quotes, same-week turnaround on most projects.

UKBC Assistant

Online now · replies instantly