The brief

The process

  • After drawings were reviewed, our ATTMA registered engineer tested this property in accordance with strict

air tightness testing procedures

  • All calibrated equipment was setup to ensure the most accurate result possible was achieved

  • Ventilation Testing was also carried out to ensure Part F Regulations were met

The results

  • Compliant

  • All Ventilation & Air Tightness Tests passed their targets