The brief
- UK Building Compliance recently conducted Air Pressure Testing at a New Build property
The process
- After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible
The results
-
Compliant
-
The plot achieved an extremely good score which shows that it has a very good level of Air Tightness